Exciting Projects in the Works!

WE has many exciting projects in the works.

Alliance Bank – Woodway, Texas

This project consists of new 16,100 square foot (enclosed), 2-story bank building to be located on Archway Drive in Woodway, Texas.

https://www.wacotrib.com/news/business/mike_copeland/mike-copeland-alliance-bank-woodway-hq-cen-tex-chamber-airbnb/article_5a5ed37b-7149-59e6-8f05-7ee5e6dbf278.html

Bordeaux Apartment Rebuild – Waco, Texas

The project consists of the reconstruction of an apartment building destroyed in a fire.  The building is a two-story, 8-unit facility, with each apartment unit having 3 bedrooms and 2 baths.  Four of the units will have fireplaces.  The existing slab is anticipated to be reused.

 

Magnolia Press Coffee Shop – Waco, Texas

The project consists of providing structural plans & specifications for renovations of 418 South 8th Street Waco, Texas for the expansion of the Magnolia Silos District.

https://magnolia.com/introducing-our-coffee-shop-magnolia-press/

https://www.kwtx.com/content/news/Fixer-Upper-stars-reveal-renderings-of-new-coffee-shop-512267512.html

China Spring Independent School District Tennis Complex – China Spring, Texas

The project consists of a new tennis complex for the China Spring Independent School District including 8 (eight) tennis courts and a concession stand / toilet / locker room building.

 

Pivovar Czech Brewery – Waco, Texas

The Project consists of the renovation of an existing +/- 10,000 s.f. building at 320 South 8th Street in Waco, Texas for the purpose of installing a brew pub with living quarters above.  Engineering work to include structural review of existing structure, minor first floor modifications as required to install new brew pub, foundation & framing to support new second and third floor levels and roof.

https://www.wacotrib.com/news/business/czech-inspired-restaurant-hotel-brewery-wins-tif-nod-alongside-elm/article_59c9b752-ceed-5df6-a942-c8661bdc290a.html

https://wacotrib.com/business/local/czech-backers-of-pivovar-visit-waco-to-see-progress-weigh-more-projects/article_6c367c9c-e7b1-11ea-be13-932be68f64cc.html

 

 

Current Projects

Winton Engineering has been very active in many projects this year. Here are a few that we have been currently working on:

  • Sykora Family Ford

This project included additions and renovations to the Sykora Family Ford Dealership in West, Texas in keeping with the Ford Trustmark / Quick Lane branding concept.  The renovations included doubling the size of the existing showroom and creating a new Quick Lane service area, as well as interior renovations and a new wash building.  On the exterior, renovations included a new brand wall and sign tower.

  • First National Bank of McGregor

This project consists of approximately 3,200 square feet of office additions and renovations to the existing First National Bank of McGregor.

  • China Spring Strip Center

The Project consists structural engineering and foundation of a new retail center, approximately 6,700 square feet located on China Spring Road in China Spring, Texas.

 

  • The National Banks of Central Texas – Copperas Cove, Texas

The Project consists of a new bank branch office.  The building is approximately 4,900 square feet in size, with an additional 2,600 square feet (approximate) of covered drive-through areas.

  • 300 S. 6th Street – Mary Avenue Market – Waco, Texas
The Project consist of structural engineering and specifications for the Mary Avenue Market in downtown Waco, Texas just steps away from the Magnolia Market in the Silo District.

 

  •  Redwoods, Inc. Renovations – Waco, Texas
The Project consists of renovations and upgrades to an existing building supply / lumber facility including the conversion of a warehouse space into executive office space. (Pictures coming soon)
  • Mission Waco – Jubilee Market Grocery Store – Waco, Texas
The Project consists of renovations to a non-profit grocery store in a low-income, food desert neighborhood of Waco for Mission Waco.  The project breathed life into an old building that started as a Safeway in the 1930’s and later as convenience stores.  The building is 6,500 square feet.
  • ARC Companies Building Renovations – Waco, Texas

 The Project consists of renovations to the existing building (former body shop) at 225 S. 12th street for use as the corporate headquarters for the ARC family of companies just around the corner from the Magnolia Silos.

  • Balcones Distillery – Additional Designs & Phase B Expansion – Waco, Texas

The project consists of the Phase B expansion of the Balcones Distillery’s new facility at 225 South 11th Street.  This is an ongoing project.  The expansion includes installation of one wash still, one spirit still, two fermenting tanks, one steam boiler, and associated building alterations as required for the expansion.  Also, additional design projects such as the new Tasting Room / Reception area.